Used on external facades, applied manually or sprayed. Can be applied on all typical mineral bases, such as: concrete, cement, cement-lime, lime-cement, lime, gypsum plasters etc. - after a minimum of 28 days after they are placed, and as plastering on layers with mesh reinforcement in Greinplast insulation systems, minimum 3 days after they are laid. It is an integral element of product ranges in Greinplast X and WX insulation systems (according to AT) and Greinplast EPS and WS (according to ETA). The material available in colours that can be found in the manufacturer's colour scheme. Upon the customer's request, other colour schemes are available, provided by Greinplast Tinting System (SBG).
Packaged in 25kg containers.
Only after suitable preparation of the base and when it has completely dried off, the actual plastering works may be commenced. In order to achieve the correct working consistence, it is allowed to add a small amount of GREINPLAST UX preparation (not more than 0.2 l per package). The volume of the preparation to be added should be identical for each package. The mass needs to be well agitated directly before its application. The plaster is applied at a grain thickness, with a stainless steel trowel, at an angle. After some time, when the mass does not stick to the tools anymore, the surface should be given a correct texture, which is done with a plastic trowel, held in parallel. Works on a wall forming a single plane should be carried out in a continuous manner, using material from a single production batch without intervals.
Show moreThe ambient temperature during the plaster application and drying should be between +5°C and +30°C. The optimal application temperature is +20°C. During the plaster application, until it is completely dry (minimum 3 days from the work completion); it is strictly recommended that care should be taken to secure the plaster against adverse weather conditions. During this period, temperatures below 5°C are not allowed. The plaster drying time may vary greatly, especially during periods with adverse weather conditions. Failure to observe the aforementioned recommendations, bad base preparation or incorrect plaster application may lead to the appearance of permanent colour differences on plastering surfaces (efflorescences, dye penetration), and in extreme scenarios – reduction of its durability and even flaking. The product contains admixtures that may have aggressive action on metals, glass and wood. Surfaces exposed to soiling with plaster should be secured, and when soiling occurs, remove stains before they turn dry.
Information contained in the manual help ensure the optimal use of the product, however, it does not create any legal liability of the Manufacturer, due to the fact that the conditions of use remain outside of its control. We do not accept any responsibility if the material is combined with products from other Manufacturers or with such that are not listed in the reference documents (AT & ETA).